Process Piping Installation

We install and weld process piping for industrial facilities, working with stainless steel (AISI-304L, AISI-308L, AISI-316L, AISI-321), carbon steel (St.20, 30), titanium and aluminium.

Welding technologies used:

  • Manual welding in argon atmosphere (WIG-TIG)

    Pipe diameter: from 6 mm

    Wall thickness: from 0.8 mm

  • Orbital welding (WIG-TIG)

    Pipe diameter: from 20 mm to 115 mm

    Wall thickness: up to 3 mm

  • MMA and MIG-MAG

    Used for working with pipe walls over 8 mm (with prior edge preparation and multilayer filling).

Wall thickness and welding method:

  • Up to 2.6 mm (AISI-304L, AISI-316L, AISI-321)

    "Pendel" method without the use of filler material (WIG–TIG).

  • Over 2.6 mm

    Welding of dividing grooves using filler material (WIG–TIG).

  • Over 8 mm

    Additionally, MMA or MIG–MAG is used (with edge preparation and multilayer welding).

This combined approach helps balance weld quality, productivity and project cost. We can support the full work sequence: documentation review, cutting, pipe preparation, assembly, valve installation, welding, verification and testing of pipeline systems.

To discuss a future project, contact us by phone, email or messenger. We will review the scope, clarify technical details and suggest a practical next step.